- Quotes are valid for 60 days.
- All quotes are subject to final template. Typical additional charges can be:
- Smaller or larger sized quartz pieces.
- Large worktops, for example : an island that requires more than a 2 man lift.
- Poor Access.
- Parking Charges or toll charges.
- Not limited to the examples above; other scenarios can cause a price change.
- We require 5 working days from confirmation of order to arrange our templater to come to site
- When our templater arrives the following is required to be on site to ensure they are made to an accurate dimension:
- Existing Worktops (if applicable) to be removed.
- Carcasses to be set in the position required.
- Hob, Sink & Tap(s) to be on site (Alternativley the make, model and dimensions to be known).
- Any other additions that are to be installed on the worksurfaces to be on site.
- The Template will need to be signed off by the customer or someone of authority to confirm they wish to have the work surfaces made as shown in the template.
- If the customer does not wish to precede post template, the amount owed would be the template charge plus an additional £50 (ex VAT) for admin work.
- Installation will be within 8 working days of templates being signed off
- Unless specifically agreed, finished pieces will be within +/- 3mm tolerance of template.